Crafton Hills College SSA Building

Yucaipa, CA

The 16,000 sf of renovation work in the existing building included new interior spaces and finishes, new HVAC, plumbing, lighting, electrical and data infrastructure, and new restrooms. 19six worked extensively with the faculty and administration to develop the new faculty offices, conference rooms, and a classroom for the disabled student program, all housed within the building. Code upgrades, structural seismic retrofit, and hazardous material abatement was also done throughout the entire building. Other renovations to the existing building include new roofing, windows, doors, and exterior concrete cleaning and sealing.

More Higher Education Projects